The Kitchen Project...
Weeks Eight & Nine
Very busy two weeks... Laid down all of the tile, mounted the exhaust hood, added some sheetrock and have the other walls just about ready for paint. The countertops were installed today (12/22), they finished about noon and the I plumbed and piped the sink and mounted and wired the cooktop... First time in two months that we have a functional stove... Still have some sanding and painting to do, additional lighting needs to be wired and installed, along with lots of trim work (that will be an over the winter project...). Looks like we will have a kitchen for Christmas after all...
Kitchen Remodel Weeks
Eight & Nine 12/22/2008 |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|