The Kitchen Project...
Week Five
Finished the electrical (with some help from Milt) and got the water line to the new refrigerator location. All the walls are sheetrocked and just about ready for primer. With help from Don, Chris, and Jen, I got the ceiling sheetrocked where the cabinets are and hopefully going have that ready for primer in a day or so. Doesn't look like the cabinets are going to get installed before Thanksgiving, shooting for the first week of December...
Kitchen Remodel Week
Five 11/23/2008 |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|