The Kitchen Project...

 

More demo, now down to the slab... The crack was worse that I thought, hopefully going to pour new concrete this week. New water lines are installed to the sink and the washing machine (Pex is really nice to work with and a lot cheaper than copper), hoping to start electrical this week as well.

Kitchen Remodel Demo Week Two
10/30/2008